New module · V6

Module · New in V6Module · New in V6

Plan what matters,without forcing an ERP.

The new PLAN module in SESAHUB V6 brings into one tool what today lives in five separate schedules: tasks, audits, component orders and maintenance work. One channel, one truth, in real time — without double entry, and without depending on an ERP the shop floor will never open.

A production team gathered around a touchscreen kiosk showing the week's schedule in SESAHUB

Industrial scheduling, finally in one place

One view, every type of work

Team tasks, periodic audits, component orders, maintenance work — one tool, one timeline, filterable by department and by type.

Calendar view or Gantt view

Switch between a weekly calendar (for the team level) and a Gantt view (for the project level). Everyone works in the format that helps them decide.

Resources and availability

Assign a resource to a task and see workload conflicts immediately — no more discovering the overbooking in Monday's meeting.

Recurrences and templates

Monthly 5S audits, weekly reviews, floor walks: recurring tasks fire on their own. You set the template once, PLAN takes it from there.

Progress tracking

Every task carries its status, its owner and its due date — and surfaces automatically in BOARD as soon as it slips.

Automatic escalation

An overdue task rises to the right level according to your rules — no more chasing by hand. Escalation works the same on paper and on screen.

Our approach

Anticipate · Smooth out · Make visible

Schedule easily

your tasks, audits, orders and maintenance work — through a single channel.

Track in real time

what is under way and what is coming — with no re-keying.

See at a glance

the availability and status of your resources.

The PLAN module does not replace your organization. It makes it legible.

The PLAN module does not replace your organization. It makes it legible.

"We need scheduling software. Proper software." We hear it every week.

Except that on 8 sites out of 10, the real problem is not the absence of a schedule. It is the coexistence of five different schedules for the same information — each updated by a different person, none of them authoritative.

What we see

  • A master spreadsheet nobody updates beyond three weeks out.
  • A wall of cards living its own life, out of step with reality.
  • A theoretical MRP the shop floor has no key to.
  • A team leader's notebook holding the only truth — which leaves when they do.

Why this works

Because PLAN is built on what SESA SYSTEMS has observed on the floor — the manufacturer behind QUALITY POINTS and Lean workplace furniture for 35 years. Not a generic ERP discovering industrial scheduling.

Request a demo

Frequently asked questions

Does PLAN replace our MRP or ERP?+

No: it schedules neither detailed production nor manufacturing orders. PLAN is dedicated to human and operational work — team tasks, audits, maintenance, corrective actions. It complements your MRP/ERP rather than competing with it.

Who can create a task in PLAN?+

Any authorized user can create a task within their scope. Rights to create, assign and close are configured by role — the same logic as the other SESAHUB modules.

How does PLAN handle recurring work?+

You define a template (monthly 5S audit, weekly walk, quarterly check) with its frequency, its default owner and its checklist. PLAN generates the occurrences on its own and escalates them when they run late.

Is PLAN included in the SESAHUB core or optional?+

PLAN is a V6 module available in the standard SESAHUB core. The rollout arrangements (training, configuration, migration of existing schedules) are agreed with your project manager.